Certainly, it can be done to build a wet space upstairs presented it is actually made appropriately. When creating a moist area, a gradient have to be manufactured to channel and direct the water to the drain as well as space ought to tanked (waterproofed) Capable Group presents trustworthy bathroom https://jackiep395nnk0.wikissl.com/user