Location the very first plank with the tongue aspect struggling with the wall. Push the top seam of the 2nd plank in the conclusion seam of the main plank, and then lock them together by laying the plank down. Continue working left to ideal. This Site works by using cookies https://spc-flooring-manufacturer07097.shoutmyblog.com/30792997/about-spc-flooring-manufacturer