Smoke leakage (S): Failure of the criterion shall have happened In the event the flow charge in duct A throughout the test exceeds ten m³ / (m² h), linked to 20 °C and 1013 mbar, connected to the internal surface area place of the duct inside the furnace. The first https://ductworth-installation90122.daneblogger.com/35500933/the-best-side-of-caswell-group